Planificación de proyectos en la construcción

dc.contributor.advisorMoreno Penroz, Nicolás
dc.contributor.authorBranchadell Gwynne, Felipe Ignacio
dc.contributor.editorFacultad de Ingeniería
dc.contributor.editorEscuela de Obras Civiles
dc.date.accessioned2020-04-30T20:54:40Z
dc.date.available2020-04-30T20:54:40Z
dc.date.issued2009
dc.descriptionTesis (Ingeniero Constructor)es
dc.description.abstractCualquiera sea el rubro en el cual se desarrolla a un profesional dentro del ámbito de la construcción, se encuentra continuamente obligados a gestar nuevas ideas, que exigen del esfuerzo de un grupo importante de personal capacitado, dispuesto a llevar un orden y disciplina adecuados para lograr transformar esa idea inicial en un proyecto, y verlo finalmente materializado. Particularmente en el rubro de la construcción, se necesita el trabajo coordinado de arquitectos, ingenieros, diseñadores y abogados (entre otros profesionales), que hace posible que ese proyecto vea la luz gracias a una eficiente Planificación (Equipos Multidisciplinarios). Estas páginas pretenden dejar en claro todos los procesos que encierra la planificación de Proyectos, y constituir una herramienta útil para cualquier profesional que desee conocer qué pasos se han de seguir, antes de enfrentarse a lo que es desarrollar un correcto plan de trabajo. Es importante saber que para llevar a cabo una adecuada planificación, se debe tener en cuenta una serie de factores, todos relevantes, entre los que se cuentan: el tiempo del que se dispone para llevar a cabo el proyecto, la determinación de los costos que significa su ejecución y el análisis de los recursos de los cuales se dispone, entre otros, como así también saber fijar objetivos claros y asignar a cada profesional la labor y responsabilidad que le corresponde, con el fin de evitar posibles conflictos posteriores. Se muestran también en esta tesis distintos métodos para ordenar los tiempos y dineros, lo que permite llevar un proceso de Planificación limpio y ordenado. Es importante tener en mente que la planificación es un proceso que se hace presente a lo largo de toda la ejecución del proyecto; con esta idea clara desde un principio, se puede optar a ejecutar una obra, si bien no exenta de contratiempos imprevisibles, con la seguridad de que se contará con las herramientas para llevarla a cabo de manera limpia, ordenada y controlada en todos sus aspectos.es
dc.description.abstractIn every ítem in wich we developt inside of the professional area, we will be constant obligated to prepare new ideas, that they need far the effort of an important group of qualified personnel ready to take an order and discipline adapted to manage to transform this initial idea in a project, and to see it finally materialized. Particularly in the item of the construction, there is needed of the coordinated works of architects, engineers, designers and lawyers (between other professionals), that it will make possible that this project sees the light thanks toan efficient Planning. These pages try to clarify in all the processes that the Project planning anclases, and to constitute a useful tool for any professional who wants to know what steps have to follow, befare facing what is to develop a correct plan of work. lt is important to know that to carry out a suitable Planning, there must bear in mind a series of factors, all the relevant ones, between which they are counted: the time of the one that prepares to carry out the project, the determination of the costs that will mean his execution and the analysis of the resources of which arranges, between others, as like that also to be able to fix ele.ar objectives and assign to every professional the labor and responsibility that corresponds in order to avoid possible later conflicts. Different methods will show also in this thesis to order the times and money wich allows to take a clean and tidy process of Planning. lt is important to have in mind that the Planning is a process that will become present along the whole execution of the project; with this clear idea from a beginning, it is possible to choose to executing a work, though it does not exempt of unforeseeable misadventures, with the safety of which one will possess the tools to carry out the work in a clean, tidy and controlled in all his aspects.
dc.identifier.urihttp://repositorio.unab.cl/xmlui/handle/ria/13242
dc.language.isoeses
dc.publisherUniversidad Andrés Belloes
dc.subjectIndustria de la Construcciónes
dc.subjectAdministraciónes
dc.subjectPlanificación de la Industria de la Construcciónes
dc.titlePlanificación de proyectos en la construcciónes
dc.typeTesises
Archivos
Bloque original
Mostrando 1 - 1 de 1
No hay miniatura disponible
Nombre:
a68993_Branchadell_F_Planificacion_de_proyectos_en_la_2009.pdf
Tamaño:
1.52 MB
Formato:
Adobe Portable Document Format
Descripción:
TEXTO COMPLETO EN ESPAÑOL
Bloque de licencias
Mostrando 1 - 1 de 1
No hay miniatura disponible
Nombre:
license.txt
Tamaño:
1.71 KB
Formato:
Item-specific license agreed upon to submission
Descripción: