Plan de cierre para mina El Dorado por método de explotación a rajo abierto

dc.contributor.advisorVillarroel Villalobos, Jorge Antonioes
dc.contributor.authorCastro Briones, Carolina Alejandra
dc.contributor.editorFacultad de Ingenieríaes
dc.date.accessioned2021-11-05T15:25:14Z
dc.date.available2021-11-05T15:25:14Z
dc.date.issued2019
dc.descriptionTesis (Ingeniero Civil en Minas)es
dc.description.abstractLa herramienta plan de cierre nace por la necesidad de incluir la consciencia social y ambiental desde la gestación de un proyecto minero. En este trabajo se realizó el plan de cierre de aplicación general en base a la legislación actual chilena según la estructura sugerida por Sernageomin de Proyecto El Dorado ubicado en la región de Coquimbo, comuna de Ovalle. Este pretende producir 130.000 ton/mes de concentrado mediante la explotación de cuatro rajos. Para la realización del plan se dividieron las instalaciones presentes en principales, complementarias y auxiliares, donde para cada una de ellas se evaluó el riesgo de siniestros. De esto surgió que las tres divisiones tuvieron riesgo alto. Para la primera división se consideró la disminución de ángulo de talud y recubrimiento de taludes con material de alta granulometría. Para la segunda y terceras se ideó el desmontaje de las estructuras, limpieza y la descompactación de suelo en algunos sectores para hacerlo más acorde al entorno. Posterior a las medidas de cierre, se generó el seguimiento ambiental de las instalaciones remanentes mediante monitoreo de material particulado, suelo y estabilidad de taludes. Realizando un cronograma de las medidas de cierre y post cierre. Luego se valorizó cada medida en UF para establecer la garantía financiera según la legislación chilena. Finalmente se generó el plan de difusión a la comunidad identificando la población objetivo y estableciendo que dicha difusión se realizará dos años antes de la ejecución de las medidas de cierre. Con el fin de asegurar la estabilidad química y física.es
dc.description.abstractThe closure plan tool was born from the need to include social and environmental awareness from the gestation of a mining project. In this work, the general application closure plan was made based on the current Chilean legislation according to the structure suggested by Sernageomin about the El Dorado Project located in the Coquimbo region, Ovalle commune. This is intended to produce 130,000 ton / month of concentrate through the exploitation of four pits. For the realization of the plan the present facilities in main, complementary and auxiliary were divided, where for each one of them the risk of losses was evaluated. From this arose that the three divisions had high risk. For the first division, the reduction of slope angle and slope coverage with high granulometry material was considered. For the second and third, the dismantling of structures, cleaning and decompaction of soil in some sectors was devised to make it more in line with the environment. After the closure measures, the environmental monitoring of the remaining facilities was generated by monitoring particulate material, soil and stability of slopes. Making a chronogram of the closing and post closing measures. Then, each measure was valued in UF to establish the financial guarantee according to Chilean legislation. Finally, the dissemination plan was generated for the community, identifying the target population and establishing that the dissemination will take place two years before the execution of the closure measures. With the final purpose to ensure chemical and physical stability.es
dc.identifier.urihttp://repositorio.unab.cl/xmlui/handle/ria/20767
dc.language.isoeses
dc.publisherUniversidad Andrés Belloes
dc.subjectChilees
dc.subjectConcepciónes
dc.subjectRegión del Bío-Bíoes
dc.titlePlan de cierre para mina El Dorado por método de explotación a rajo abiertoes
dc.typeTesises
Archivos
Bloque original
Mostrando 1 - 1 de 1
Cargando...
Miniatura
Nombre:
a133558_Castro_C_Plan_de_cierre_para_mina_2019.pdf
Tamaño:
2.45 MB
Formato:
Adobe Portable Document Format
Descripción:
TEXTO EN ESPAÑOL E INGLÉS
Bloque de licencias
Mostrando 1 - 1 de 1
No hay miniatura disponible
Nombre:
license.txt
Tamaño:
1.71 KB
Formato:
Item-specific license agreed upon to submission
Descripción: