Método de control de enfierraduras, encofrados y hormigonados en proyectos de edificación
dc.contributor.advisor | Sierralta Mella, Juan Eduardo | |
dc.contributor.author | Ljubetic Urzúa, Andrés Antonio | |
dc.contributor.editor | Facultad de Ingeniería | |
dc.contributor.editor | Escuela de Obras Civiles | |
dc.date.accessioned | 2020-05-04T18:01:09Z | |
dc.date.available | 2020-05-04T18:01:09Z | |
dc.date.issued | 2009 | |
dc.description | Tesis (Ingeniero Constructor) | es |
dc.description.abstract | Este trabajo tiene como objetivo desarrollar y establecer un método de control para las principales faenas a ejecutar en obra gruesa, basándose en un conjunto de procedimientos de trabajo los cuales pueden ser aplicables a cualquier empresa constructora. Este método está basado en un conjunto de procesos, instructivos de trabajo, diagramas de flujo, especificaciones de control, y registros de inspección, que permitan asegurar el cumplimiento de las exigencias especificadas para las principales faenas de obra gruesa, como lo son la enfierradura, colocación de encofrados y el proceso de hormigonado. Lo que se pretende a futuro es proporcionar evidencia que todos los procesos fueron controlados y llevados a cabo en conformidad con los requisitos establecidos en las distintas normas que rigen la construcción en el país. Para el desarrollo de este trabajo se realizó un análisis comparativo entre las obras donde se implementó el método de control propuesto, para determinar las fallas más comunes presentadas en la realización de las faenas estudiadas. | es |
dc.description.abstract | This study aims to develop and establish a control method for ali major tasks performed in structural work, based on a set of working procedures which may be applicable to any construction company. This method is based on a set of processes, work instructions, flow diagrams, control specifications, and inspection records, which will ensure compliance with the specified requirements for the main tasks of structural work, as armors, molding placement and concreting process. This work is looking forward to provide evidence that ali processes were controlled and conducted in accordance with the requirements of different standards governing construction in our country. For the development of this a comparative analysis between the different constructions where the proposed control method was implemented was made, to establish the most common mistakes made during the construction process. | |
dc.identifier.uri | http://repositorio.unab.cl/xmlui/handle/ria/13259 | |
dc.language.iso | es | es |
dc.publisher | Universidad Andrés Bello | es |
dc.subject | Industria de la Construcción | es |
dc.subject | Control de Calidad | es |
dc.subject | Encofrado (Construcción) | es |
dc.title | Método de control de enfierraduras, encofrados y hormigonados en proyectos de edificación | es |
dc.type | Tesis | es |
Archivos
Bloque original
1 - 1 de 1
No hay miniatura disponible
- Nombre:
- a69368_Ljubetic_A_Metodo_de_control_de_enfierraduras_2009.pdf
- Tamaño:
- 3.76 MB
- Formato:
- Adobe Portable Document Format
- Descripción:
- TEXTO COMPLETO EN ESPAÑOL
Bloque de licencias
1 - 1 de 1
No hay miniatura disponible
- Nombre:
- license.txt
- Tamaño:
- 1.71 KB
- Formato:
- Item-specific license agreed upon to submission
- Descripción: