Proyecto de tesis Skate Park Parque O'Higgins.

dc.contributor.advisorDe La Carrera Díaz, Jorgees
dc.contributor.authorRomero González, Davides
dc.contributor.editorFacultad de Ingenieríaes
dc.contributor.editorEscuela de Construcciónes
dc.date.accessioned2014-05-12T23:31:11Zes
dc.date.accessioned2016-08-02T17:28:27Z
dc.date.available2014-05-12T23:31:11Zes
dc.date.available2016-08-02T17:28:27Z
dc.date.issued2012es
dc.descriptionTesis (Ingeniero Constructor)es
dc.description.abstractRESUMEN: El motivo de esta memoria es exponer todo el proceso constructivo y financiero de la construcción del Skate Park ubicado en el Parque O’Higgins, dentro del sector del ex pueblito. El objetivo es mostrar los diferentes métodos constructivos que se emplearon para ejecutar una obra con matices complejos por sus formas de diseño, además de analizar el desarrollo financiero que implica una obra de este tipo tan poco común. Este proyecto pertenece a un plan maestro de renovación y mejoramientos dentro del parque, desarrollado por la Ilustre Municipalidad de Santiago, para esto encarga a su contratista de conservación de la Comuna, construir esta cancha para skater profesional, el cual posee distintas zonas de complejidad, desde menores hasta extremas, considerando una cúpula donde se puede girar en 360 grados. Esta obra tuvo un costo de $192.000.000.- equivalente a 5.188 UT.M.- aproximados, y un plazo de 8 meses a contar de Abril del 2009, las superficies construidas entre street, bowls, rampas y elementos arquitectónicos fue de 2.000 m2. Entiéndase como street los pavimentos horizontales sin mayores resaltes, bowls son pavimentos curvos tanto horizontales como verticales que están bajo la cota de piso 0, rampas son los pavimentos rectos inclinados que unen los street a distintas cotas. Los resultados obtenidos en esta obra, fueron gracias a un estudio que se realizó al momento de la entrega del proyecto a la constructora, con visitas a otro Skate Park construido en el parque Los Reyes, donde pude apreciar las debilidades que se reflejaron después de trascurrido dos años de uso de la cancha, como grietas superficiales, daño en las esquinas de los hormigones por no tener una protección metálica, desprendimiento de casi la mayoría de los perfiles ángulo que se instalaron posteriormente al hormigonado, cuyo objetivo era proteger los cantos vivos de los hormigones. Estas observaciones me sirvieron para implementar un proceso constructivo que permitiera minimizar esas fallas, y así obtener una buena calidad de obra. Las conclusiones pretenden demostrar la buena calidad de los trabajos obtenidos, gracias a los sistemas constructivos empleados, de modo que sirva para cualquier profesional con un proyecto de estas características.es
dc.description.abstractABSTRACT: The motive of this report is to present the whole constructive and financial process of building of Skate Park located in Parque O’Higgins, in the former village sector. The aim is to show the different construction methods that were used in this project with complex nuances of design forms, in addition to analyzing financial development of this uncommon project. This project is part of a master plan for renovation and improvements within the park developed by the Municipality of Santiago entrusting conservation of the commune by building professional skater park with distinct areas of complexity and a dome which can rotate 360 degrees. This project had a cost of $192,000.000, equivalent approximately to 5,188 UT.M and 8 months of construction starting April of 2009 and built between street surfaces, bowls, ramps and architectural elements covered 2,000 m2. It is understood that horizontal street pavements are without curb, the bowls are round fixtures that are equally horizontal and vertical on street level and ramps are straight inclining pavements connecting areas of different heights. The results were obtained by a study carried out at the time of the delivery of the project. With visits to another Skate Park built in the Parque Los Reyes, where I could see weaknesses that were reflected by cracks, damage in corners of concrete that did not have metal shield, most of the corners that were installed later for protection of angles were detached after being used only for two years. These observations allowed me to implement a constructive process that would understate these faults and obtain a good quality of work. The conclusions are intended to demonstrate the good quality of work achieved thanks to the constructive systemen
dc.identifier.urihttp://repositorio.unab.cl/xmlui/handle/ria/1711
dc.language.isoeses
dc.publisherUniversidad Andrés Belloes
dc.relation.ispartofseriesClasificación: 624.092 R763 2013es
dc.subjectInstalaciones Deportivas -- Chile -- Santiago -- Diseño y Construcción.es
dc.subjectEspacios Abiertos -- Chile -- Santiago.es
dc.subjectFULLes
dc.titleProyecto de tesis Skate Park Parque O'Higgins.es
dc.typeTesises
Archivos
Bloque original
Mostrando 1 - 1 de 1
Cargando...
Miniatura
Nombre:
Romero_D_Skate Park parque Ohiggins_2012.pdf
Tamaño:
6.25 MB
Formato:
Adobe Portable Document Format
Descripción:
TESIS
Bloque de licencias
Mostrando 1 - 2 de 2
No hay miniatura disponible
Nombre:
license.txt
Tamaño:
1.71 KB
Formato:
Item-specific license agreed upon to submission
Descripción:
No hay miniatura disponible
Nombre:
license.txt
Tamaño:
1.71 KB
Formato:
Item-specific license agreed upon to submission
Descripción: