Medición de la productividad de la mano de obra en "Intermodal La Cisterna"

dc.contributor.advisorMoreno Sepúlveda, NicolÔs
dc.contributor.authorMatamala Contreras, Gonzalo Javier
dc.contributor.editorEscuela de Construcción Civil
dc.date.accessioned2021-01-12T14:55:13Z
dc.date.available2021-01-12T14:55:13Z
dc.date.issued2007
dc.descriptionTesis (Ingeniero Constructor)es
dc.description.abstractUn tema recurrente en este último tiempo, hace referencia a los niveles de productividad en la industria de la construcción, donde los procesos operativos y de gestión, presentan variables que se transforman en factores críticos de éxito. Para lograr un control sobre éstos, se debe trabajar sobre los flujos de información, recursos humanos, materiales y equipos. Sin embargo, a diferencia de otras industrias de proceso, ésta presenta un desfase en lo que se refiere al grado de tecnologización y capacitación. Pero la diferencia mÔs sustancial con respecto a las otras industrias de proceso es el hecho de que equipos multidisciplinarios roten de un proyecto a otro, en diversas y cambiantes condiciones geogrÔficas, al igual que la logística en la cadena de abastecimiento (proveedores, almacenamiento y distribución interna). Con respecto a los procesos de soporte, tales como control de avance, costos y mano de obra, los sistemas empleados por las empresas constructoras entregan en general una visión parcial del comportamiento de la productividad en obra, y no son muy exactos ni Ôgiles para medir y detectar problemas de productividad. Respondiendo a las necesidades de la construcción antes mencionadas, se han desarrollado herramientas que permiten medir la productividad, entregando valores detallados y efectivos para la gestión, en términos del manejo de factores productivos, como mano de obra, uso de equipos y materiales. Este último es el tema principal de esta memoria. La C\.Jal contiene la explicación detallada del sistema "Lean Production" y su plena utilización en la empresa constructora Precon, obra "lntermodal la cisterna", una obra de extensión con aproximadamente 180 trabajadores. En esta obra se detectarÔn los problemas que afecten directa o indirectamente a la productividad, se aplicarÔn acciones correctivas y se analizarÔn los resultados.es
dc.description.abstractA tapie appellant in the latter time, refers to the levels of productivity in the indusstry of the construction, where the operative processes and management, they present variables that transform in critica! factors of success. To achieve a control on these, it is necessary to work on the flows of information, human resources, material and equipments. Nevertheless, unlike other industries of process, this one presents Ā·a lack of coordination regarding the degree of training. But the most substantial difference with regard to other industries of process is the fact that multidisciplinary equipments rotate from a project to other one, in diverse and changeable geographical conditions, as the logistics in the chain of supply (suppliers, storage and interna! distribution). With regard to the processes of support, such as control of advance, costs and manpower, the systems used by the building firms deliver in general a partial vision of the behavior of the productivity in work, and are neither very exact nor agile to measure and to detect problems of productivity. Answering to the needs of the construction before mentioned, there have developed tools that allow to measure the productivity, delivering detailed and effective values for the management, in terms of the managing of productive factors, as manpower, use of equipments and materials. The latter is the principal tapie of this memory. Which contains the detailed explar,ation of the system "Lean Production" and the full utilization in Precon building firm, work "lntermodal La Cisterna", an extension work with approximqtely 180 workers. In this work there will be detected the prqblems that they affect directly or inqirectly to the productivity, correctiva actions will be applied and the results will be analized.
dc.identifier.urihttp://repositorio.unab.cl/xmlui/handle/ria/17476
dc.language.isoeses
dc.publisherUniversidad AndrƩs Belloes
dc.subjectMano de Obraes
dc.subjectNiveles de Productividades
dc.subjectIndustria de la Construcciónes
dc.subjectControl de Procesoses
dc.subjectAcciones correctivases
dc.subjectChilees
dc.titleMedición de la productividad de la mano de obra en "Intermodal La Cisterna"es
dc.typeTesises
Archivos
Bloque original
Mostrando 1 - 1 de 1
No hay miniatura disponible
Nombre:
a61427_Matamala_G_Medicion_de_la_productividad_de_2007.pdf
TamaƱo:
3.49 MB
Formato:
Adobe Portable Document Format
Descripción:
TEXTO COMPLETO ESPAƑOL
Bloque de licencias
Mostrando 1 - 1 de 1
No hay miniatura disponible
Nombre:
license.txt
TamaƱo:
1.71 KB
Formato:
Item-specific license agreed upon to submission
Descripción: